Quantcast
Channel: Power management forum - Recent Threads
Viewing all articles
Browse latest Browse all 35901

BQ28Z610: BQ28Z610

$
0
0

Part Number:BQ28Z610

Hi everyone, I have a quistion.

There is a switch(S1) at the bq28z610 EVM board.

Because my system supplied power from the battery pack, i'm using this switch to power up the bq28z610 after battery pack connection.

Before push the switch, my system is off, so i can't command that set the chg/dsg fets.

My quistion is,

is there any solution that automatically power up the bq28z610 after battery pack connect to bq28z610(without command).


Viewing all articles
Browse latest Browse all 35901

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>