Quantcast
Channel: Power management forum - Recent Threads
Viewing all articles
Browse latest Browse all 35901

bq27421 - proper manufacturing process?

$
0
0

What is a suggested process for bringing a bq27421 design to production? It appears there are many ways to get there.

1. Minimal one would be to just set the four things (Design capacity, termination voltage, design energy and taper rate) and then just let the product go through various cycles in normal use. We are finding this may not necessarily expose the gauge to all the conditions it needs  to learn.

2. Perform controlled learning on the bench, and then use Qmax value and Ra tables from that to load to every gauge  by their host processors on ITPOR 

3. Perform controlled  learning on the bench, generate golden image and have host processor load all of it on ITPOR

Comments and thoughts are welcomed!


Viewing all articles
Browse latest Browse all 35901

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>