Hi TI,
We use TPS53679 as our CPU core power solution (VCCIN) with 3-ph setting.
We found the phase adding / shedding setting is different from the actual measured value while performing the efficiency measurement.
So I have two questions as below:
1. What kind of current information (I_avg or I_peak or I_valley) that TPS53679 uses for phase adding/shedding control?
2. Does the Iout_cal_gain calibration impact the current information that for phase control?
Phase adding | Fusion Setting (A) | Measured value (A) |
1 to 2 | 24 | 24 |
2 to 3 | 42 | 40 |
Phase shedding | Fusion Setting (A) | Measured value (A) |
3 to 2 | 28 | 34 |
2 to 1 | 14 | 18 |
BR.
Stan.